Hospitality

Brand, disciplines and performance, integrated in one hotel project

A hotel brings together brand criteria, operator requirements, multiple disciplines and performance targets. That information stays coordinated throughout construction document development and reaches the site with greater clarity.

The challenge

What makes hotel construction documents complex

The developer and the operator know the program well. The complexity lies in the interfaces that program creates between disciplines.

Brand and operator criteria

Operator standards must be translated precisely into architecture, MEP, interiors, FF&E and construction documents. A deviation found in brand review forces a return to drawings that were already coordinated.

Operations and service

Guest and service circulation, public areas and back of house respond to different requirements. They must be resolved together so operations work without crossovers or adaptations on site.

Concentration of disciplines

Typical guestrooms, bathrooms, kitchens, technical rooms and common areas bring together architecture, structure, MEP, interiors and FF&E in spaces with tight tolerances. In the typical guestroom, an error repeats in every module.

Integration

One information base for brand, operations and disciplines

Architect of Record, BIM and Sustainability work from the same model and the same criteria. The design team and the operator define the design and standards. Recurso V develops, coordinates and integrates them into the construction documents.

01

Architect of Record

From the received design to construction documents

Architectural documentation of typical guestrooms, public areas and back of house, developed from the received design and brand criteria. Interfaces with engineering are resolved in the drawings.

02

BIM

Coordinating repetitive modules and technical zones

Architecture, structure, MEP and specialty systems in a federated model. Clashes are resolved in the typical guestroom before it is replicated, and in kitchens, technical rooms and ceilings before reaching the site.

03

Sustainability

Water, energy and materials performance

Water, energy and materials efficiency strategies integrated with architecture, MEP and operations, at stages when they can still be adjusted. Energy modeling and commissioning, depending on scope.

Hospitality experience

Hotel projects we have worked on

Rendering of the Skyline hotel tower, Tijuana, Baja California

Skyline

Architect of Record · BIM

Client

Cosmopolitan Group

Area

27,000 m²

Location

Tijuana, Baja California

Rendering of Dream Hotel, Tijuana, Baja California

Dream Hotel

Architect of Record

Client

Cosmopolitan Group

Area

20,000 m²

Location

Tijuana, Baja California

Rendering of the Chablé Costa Alegre villas on the oceanfront hillside

Chablé Costa Alegre

Architect of Record

Client

GND Properties

Area

28,000 m²

Location

Costalegre, Jalisco

Architectural design: Cuaik Arquitectos

We appreciate the trust of our clients and collaborators

Cosmopolitan Group
GND Properties
IHG
Secrets
Visa Desarrollos

Technical development for your hotel project

Architect of Record, BIM and Sustainability, coordinated from the received design to documentation for construction.