Institutional, education and urban

Institutional and urban projects, coordinated for construction

Buildings an organization will operate over the long term, with engineering disciplines and infrastructure that must be resolved as a single whole before reaching the site.

The challenge

Diverse programs within infrastructure that must work as a whole

Each program responds to different requirements, but building, exterior areas and infrastructure are built and operated as one project.

Organizational requirements

Operational needs must be translated into clear technical criteria for each discipline. When that does not happen, decisions surface on site or during operation.

Building and infrastructure

Architecture, structure, MEP, access and utility networks meet at the boundary between building and surroundings. Coordinating them avoids gaps between disciplines and scopes.

Continuity between phases

These projects are often developed by building, area or phase while disciplines progress in parallel. Keeping criteria and information consistent preserves the unity of the project.

Integration

One information base for the whole complex

Architect of Record, BIM and Sustainability work from the same information to coordinate programs, engineering disciplines and performance targets within the construction documents.

01

Architect of Record

From the received design to construction documents

Construction documents for buildings, circulation and common areas, developed from the defined design and criteria. The building’s interfaces with structure, engineering, exterior areas and infrastructure are integrated into the documentation.

02

BIM

Coordination between buildings and systems

Architecture, structure, MEP and special systems coordinated in a federated model to review clashes and connections between buildings, common areas and infrastructure before reaching the site.

03

Sustainability

Performance during building operation

Water, energy and materials efficiency strategies coordinated with architecture, MEP and use patterns. Performance targets are integrated from technical development and maintained in the construction documents.

Experience

Institutional, education and urban projects we have worked on

Tec de Monterrey student residences, Monterrey, Nuevo León

Tec de Monterrey Residences

Sustainability

Client

BIMMx / Perkins & Will

Area

19,800 m²

Location

Monterrey, Nuevo León

Architectural design: BIMMx / Perkins & Will

We appreciate the trust of our clients and collaborators

Tecnológico de Monterrey
Distrito Tec
TecSalud
Perkins & Will

Different buildings and phases, one set of construction documents

Let’s review your project’s scope, phases and disciplines.