Institutional, education and urban
Institutional and urban projects, coordinated for construction
Buildings an organization will operate over the long term, with engineering disciplines and infrastructure that must be resolved as a single whole before reaching the site.
The challenge
Diverse programs within infrastructure that must work as a whole
Each program responds to different requirements, but building, exterior areas and infrastructure are built and operated as one project.
Organizational requirements
Operational needs must be translated into clear technical criteria for each discipline. When that does not happen, decisions surface on site or during operation.
Building and infrastructure
Architecture, structure, MEP, access and utility networks meet at the boundary between building and surroundings. Coordinating them avoids gaps between disciplines and scopes.
Continuity between phases
These projects are often developed by building, area or phase while disciplines progress in parallel. Keeping criteria and information consistent preserves the unity of the project.
Integration
One information base for the whole complex
Architect of Record, BIM and Sustainability work from the same information to coordinate programs, engineering disciplines and performance targets within the construction documents.
01
Architect of Record
From the received design to construction documents
Construction documents for buildings, circulation and common areas, developed from the defined design and criteria. The building’s interfaces with structure, engineering, exterior areas and infrastructure are integrated into the documentation.
02
BIM
Coordination between buildings and systems
Architecture, structure, MEP and special systems coordinated in a federated model to review clashes and connections between buildings, common areas and infrastructure before reaching the site.
03
Sustainability
Performance during building operation
Water, energy and materials efficiency strategies coordinated with architecture, MEP and use patterns. Performance targets are integrated from technical development and maintained in the construction documents.
Experience
Institutional, education and urban projects we have worked on
Tec de Monterrey Residences
Sustainability
Client
BIMMx / Perkins & Will
Area
19,800 m²
Location
Monterrey, Nuevo León
Architectural design: BIMMx / Perkins & Will
We appreciate the trust of our clients and collaborators
Different buildings and phases, one set of construction documents
Let’s review your project’s scope, phases and disciplines.